On the Critical Path
On the Critical Path
Overview
Nuclear power plants are not exactly sold on the same scale as wheat, but that they can be manufactured as an exportable commodity is well illustrated in this film. For those familiar with nuclear power generation, and even for the lay audience, this is a lucid exposition of how a nuclear power plant is put together. The film shows the machining and assembly of principal components, and the "on power" operation of the Canadian plant at Pickering, Ontario. Produced by the NFB for Atomic Energy of Canada Limited.
Similar
Nuclear Fuel Waste Management (1979)
Reconstruction of the NRX Reactor 1970 (1973)
Elektro-Lähmung - Ein Film gegen die politische Ohnmacht (1989)
Nuclear Now (2023)
Inside The Atom (1948)
Seabrook 1977 (1978)
The Atom: A Love Affair (2019)
Radioactive: The Women of Three Mile Island (2024)
The Battle of Chernobyl (2007)
Sista varningen! (1980)
The Red Princess (2022)
Wolsong: Vanishing Town (2019)
We Are the Guinea Pigs (1980)
Atomic Hope: Inside the Pro-Nuclear Movement (2023)
Atomic: Living in Dread and Promise (2015)
Atom and its energy (1958)
Decommissioning Fukushima 2024: Roadmap on the Brink (2024)
Kim Jong-un: The Unauthorized Biography (2015)
Fission (2025)
Voices from Chernobyl (2016)